Blogs
E10 Spring 2008
Submitted by Cindy on Tue, 03/31/2009 - 22:09This blog outlines the work completed during E10: Engineering Design and Analysis of Spring 2008. Our final concept:

Team: Retrace Canapo
Che (Tommy) Liu, Michael Himawan, Cynthia Bayley, Yao Yuan
- Cindy's blog
- Login to post comments
- Read more
Next Steps for 2nd Draft
Submitted by Francesca on Tue, 03/31/2009 - 22:07For those who are wondering, next steps (which will be shown in the 2nd Draft) for my spatial planning work are:1. To show in graphics / visualizations the shadow analysis of the buildings that I was doing when placing the buildings on the landscape.2. To place trees on the site and cast their shadows on the landscape.
- Francesca's blog
- Login to post comments
- Read more
Winzler & Kelly's conceptual plan
Submitted by Yael on Tue, 03/31/2009 - 16:01The conceptual plan created by Winzler & Kelly was our starting point for a more detailed design of the site.

- Yael's blog
- Login to post comments
E10 presentation (user need workshop-reorganized needs)
Submitted by Yao on Sun, 03/29/2009 - 12:14Pinoleville Visits Cal:
Three PPN (Pinoleville Pomo Nation) members met with E10 Pomo teams to introduce their areas, circumstances,
and needs. We were already somewhat familiar with these after our last visit on February 2009. They also advised us on
cultural issues of discussion with PPN members. E.g., they mentioned that, if we were to talk to PPN elders,
it's disrespectful to look at them directly the whole time. So, we need look away or not look directly at them
- Yao's blog
- Login to post comments
- Read more
1st Draft of Sozzoni Plan
Submitted by Francesca on Tue, 03/24/2009 - 19:44Hello,
These are pictures of a 1st draft plan I made. Here are a few pictures.
1st pic is of the site before:

2nd pic is of the plan:

3rd pic is a 3D model, looking North, after implementing the plan:
